Work Breakdown Structure
The LBNE Work Breakdown Structure (WBS) is a means of organizing the Project by major items of equipment and impact for the Project. By using sub-groups to categorize each Sub-project, the exercise of costing the Project more efficiently becomes simpler. The WBS is a way to map out the associations of each task in a defined and organized fashion. The following WBS shows the LBNE Project with each associated Sub-project down to the Level 4 detail.
Click on a section below to expand it and show sub-sections:
Organization
1.0
LBNE Project
1.0
LBNE Project
Project Director - J. Strait
Project Scientist - M. Bishai
Project Manager - E. McCluskey
1.1
Project Management
1.1
Project Management
Project Controls Lead - B.O'Sullivan
Scheduling - K.Domann, M.Gardner
Financial manager - D.Keiner
ES&H Coordinator - M. Andrews
Computing Coordinator - E.Berman
QA - (open)
Risk Management - M. Dinnon
Project Documentation - A.Heavey, E.Freer
Administartive Support - S.Wright
1.2
Beamline
1.2
Beamline
Subproject Manager - V.Papadimitriou
L2 Engineer - S.Tariq
1.2.1
Project Management
1.2.1.1
Milestones
1.2.1.2
M&S
1.2.1.3
Project Management Effort
1.2.2
Primary Beam
L3 Manager - S.Childress
Deputy - A.Chen
1.2.2.1
System Management
1.2.2.3
Magnet Power Supplies
S.Hays
1.2.2.4
Primary Water Systems
K.Williams
1.2.2.5
Beam Instrumentation
M.Wendt
1.2.2.6
Primary Vacuum
A.Chen
1.2.2.7
Lattice Optics
J.Johnstone
1.2.2.8
Beam Loss Calculations
A.Drozhdin
1.2.3
Neutrino Beam
L3 Manager - C.Moore
1.2.3.1
System Management
TBD
1.2.3.2
Primary Beam Baffle and Window
M.McGee
1.2.3.3
Targetry
R.Zwaska
1.2.3.5
Horn Power Supplies
K.Bourkland
1.2.3.6
Decay Pipe
R.Schultz
1.2.3.8
Target Hall Shield Pile
A.Stefanik
1.2.3.9
Raw Water Systems
K.Williams
1.2.3.10
Tritium Mitigation
R.Plunkett
1.2.3.11
Remote Handling Equipment
P.Hurh
1.2.3.12
Modeling
B.Lundberg
N.Mokhov
1.2.4
System Integration
L3 Manager - R.Andrews
1.2.4.1
System Managment
1.2.4.2
Controls
G.Vogel
P.Lucas - Deputy
1.2.4.3
Interlocks
J.Anderson
1.2.4.4
Alignment
V.Bocean
1.2.4.5
Installation
R.Andrews
1.3
Near Detector Complex
1.3
Near Detector Complex
Subproject Manager - C.Mauger
L2 Engineer - Jan Boissevain
1.3.1
Project Management
D.Lee
1.3.1.1
Milestones
1.3.1.2
Project Controls
1.3.1.3
Safety
1.3.1.4
Infrastructure Interface
1.3.1.5
Integration
1.3.1.6
Installation
1.3.2
Measurement Strategy
C.Mauger
1.3.3
Beamline Measurements
G.Mills
A.Marino - Deputy
1.3.4
NDC Neutrino Detectors
W.Louis
R.Taloe - Deputy
1.3.4.1
Management
W.Louis
1.3.4.2
Fine Grain Water Tracker
W.Louis
1.3.4.3
Liquid Argon (LAr) TPCT
1.3.5
NDC Detector Magnet
1.3.5.1
NDC Detector Magnet Management
W.Sondheim
1.3.5.2
FGT Magnet
W.Sondheim
1.3.5.3
LAr Tracker Magnet
W.Sondheim
1.3.6
NDC Global DAQ and Computing Systems
H.Berns
1.3.7.2
Online Computing
TBD
1.3.7.3
Offline Computing
S.Zeller
1.5
Conventional Facilities
1.5
Conventional Facilities
L2 Project Manager - T.Lundin
L2 Mechanical Engineer - Tim Wyman
1.5.1
Project Management
T.Lundin
1.5.2
Conventional Facilities at FNAL
T.Wyman
1.5.2.1
System Management
TBD
1.5.2.2
Site Preparation
TBD
1.5.2.3
Tunnels and Halls
TBD
1.5.2.4
Service Buildings and Conventional Fit-Out
TBD
1.5.3
Conventional Facilities at the Far Site
(Sanford Underground Research Facility)
1.4
Far Detector - LAr TPC
1.4
Far Detector - LAr TPC
L2 Project Manager - J.Stewart
L2 Mechanical Engineer - R.Rucinski
L2 Electrical Engineer - T.Shaw
1.4.1
Project Management
1.4.1.1
Milestones
1.4.1.2
Management
1.4.2
Cryogenics & Cryostat
B.Norris
1.4.2.1
Cryo Management
TBD
1.4.2.2
Cryo Conceptual Design
TBD
1.4.2.3
Cryo Preliminary Design
TBD
1.4.2.4
Cryostat Prototype
TBD
1.4.2.5
Cryo Final Design Specifications
TBD
1.4.2.6
Cryo Design/Construction Contract
TBD
1.4.3
TPC and Cold Electronics
B.Yu/C.Thorn
1.4.3.1
TPC Management
TBD
1.4.3.2
Cold Electronics
Thorn
1.4.4.1
Trigger & DAQ Management
TBD
1.4.4.2
Trigger & DAQ Conceptual Design
TBD
1.5.4.3
Detector Monitoring
TBD
1.4.4.5
Readout & DAQ Infrastructure
TBD
1.4.4.6
TRDAQ Checkout
TBD
1.5.5
Installation & Commissioning
J.Howell
1.4.5.1
Installation & Commissioning Management
TBD
1.4.5.2
Installation & Commissioning Conceptual Design
TBD
1.4.5.3
Installation Prototype
TBD
1.5.5.4
Integration Prototype
J.Howell/M.Dinnon
1.5.5.5
Above-ground Detector Infrastructure
TBD
1.4.5.6
Pre-Installation Below Ground
TBD
1.4.5.8
Commissioning
TBD
1.4.6
Photon Trigger
S.Mufson
1.4.6.1
Photon Trigger Management
TBD
1.4.6.2
Photon Trigger Conceptual Design
TBD
1.4.6.3
Photon Trigger Preliminary Design
TBD
1.4.6.4
Photon Trigger Final Design
TBD
1.4.6.5
Photon Trigger Construction
TBD
1.4.6.6
Photon Trigger System Checkout
TBD
1.5
Conventional Facilities
1.5
Conventional Facilities
L2 Project Manager - T.Lundin
L2 Mechanical Engineer - Tim Wyman
1.5.1
Project Management
T.Lundin
1.5.2
Conventional Facilities at FNAL
T.Wyman
1.5.2.1
System Management
TBD
1.5.2.2
Site Preparation
TBD
1.5.2.3
Tunnels and Halls
TBD
1.5.2.4
Service Buildings and Conventional Fit-Out
TBD
1.5.3
Conventional Facilities at the Far Site
(Sanford Underground Research Facility)